PHOTOVOLTAIC POWER STATION 9 MW

DEVELOPED IN THE TOWN OF SAN VICENTE DE TAGUA TAGUA, VI REGION, CHILE

San Vicente TT Photovoltaic Power Station centrals generating a larger amount than 3 MW. The project consists of construction and operation of a solar park with a capacity of 9 MW. IMINNING supplied the San Vicente TT park with 2-inch double wall corrugated HDPE piping for their already completed construction.

PHOTOVOLTAIC POWER STATION 9 MW

DEVELOPED IN THE TOWN OF RENGO

The Rengo Solar Park consists of power generating centrals ranging levels greater than 3 MW.
The target of the project is to produce and inject approximately 25 GWh to the National Electric System (SEN in Spanish) with non-conventional renewable energy, through the use of solar power. The intent is to maximize the natural resources retrieval of the area for the production of clean energy.
IMINNING supplied this solar park with 2-inch double wall HDPE corrugated pipe for the currently finalized construction.

PHOTOVOLTAIC POWER STATION 10 MW

DEVELOPED IN THE TOWN OF TALAGANTE

Talagante 2 Photovoltaic Power Station. Larger than 3 MW Energy generating centrals. The project consists of construction and operation of a new power central, for solar energy collection and generation of electrical power.
The Talagante 2 Project will produce clean energy through the construction of a photovoltaic power station with a potency of 5,1 MW ac, using the technology of photovoltaic panels towards the transformation of solar power to electric power. IMINNING supplied this solar park with 2-inch double wall HDPE corrugated piping for the currently finalized construction.

VEHICULAR PASSAGE INSIDE THE CONSTRUCTION WORK OF FORESTAL ARAUCO

Despacho en Bodega

1

Selecciona el producto

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec 

2

Elige la tienda

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec 

3

Espera la confirmación

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec 

Despacho en Bodega

Siga estos pasos para retirar su pedido en nuestra bodega

Al llegar presente su identificación  y N° de Pedido.
Debes contar con tus EPP: casco, chaleco reflectante, zapatos de seguridad, eslingas y guantes. En caso de no disponer, solicítelos al área de logística.
Dentro de 24 hrs te contactamos y coordinamos el retiro de tu Pedido.
Horario de retiros: lunes a viernes de 9:30-13:00 a 15:00-17:30 hrs. (13:30-14:30 horario colación)

1.

Selecciona el producto

Agrega al carro un producto con retiro en tienda

2.

Paga tu Compra

Elige tu medio de pago usando tus tarjetas comerciales

3.

Espera la Confirmación

Con el mail de confirmación ya puedes ir a retirar